Behind-pipe work at GA-10A and GA-93 increased Vienna Basin production from roughly 150BOEPD to 220BOEPD. With additional output from the Anshof field in Upper Austria, ADX’s net Austrian production now stands at about 285BOEPD.
Behind-pipe work at GA-10A and GA-93 increased Vienna Basin production from roughly 150BOEPD to 220BOEPD. With additional output from the Anshof field in Upper Austria, ADX’s net Austrian production now stands at about 285BOEPD.