The Shawal-1 well was spudded on Jan. 27, 2024, and drilled to a total depth of 1,136 m in the Ghazij Formation. Well testing yielded a flow rate of 1,040 bpd of 30° API crude with 12% BS&W and 2.5 MMscfd of associated gas, on a 32/64 in. choke with a wellhead pressure of 953 psi.