The 50-day project—covering turnaround (TAR) operations as well as plug and abandonment (P&A) and decommissioning work—traditionally relied on low-load diesel turbines, a method that often results in inefficiency and higher emissions. By deploying Aggreko’s Stage V generators in modular containerized systems, engineered to meet the platform’s reduced load profile, the partners helped operators avoid nearly £900,000 in additional fuel costs and prevent 4.5 tonnes of CO₂ emissions.