Tags

ExxonMobil OKs MODEC for Guyana Hammerhead FPSO FEED

According to the EIA, the development plan calls for drilling 14 to 30 production and water-injection wells; installing and operating subsea umbilical, riser, and flowline (SURF) equipment that will connect the FPSO to the wells; using an FPSO to process, store, and offload the recovered oil; and installing a 13-km gas export pipeline from the FPSO to a tie-in on the Gas to Energy pipeline. The EIA said subsea components are expected to be installed in 2028, with FPSO installation and commissioning expected the same year.