The share of projects under construction or equipped with final investment decisions has risen to 9% from 3% of the 2030 target of 11.3 gigawatts (GW) of electrolysis capacity, E.ON said.
The share of projects under construction or equipped with final investment decisions has risen to 9% from 3% of the 2030 target of 11.3 gigawatts (GW) of electrolysis capacity, E.ON said.