The drilling campaign will target five wells at depths between 300 and 1,500 metres and is scheduled to begin in 2026. Any resulting production will be routed to BP’s existing infrastructure in the West Nile Delta.
The drilling campaign will target five wells at depths between 300 and 1,500 metres and is scheduled to begin in 2026. Any resulting production will be routed to BP’s existing infrastructure in the West Nile Delta.