The campaign begins with a vertical well targeting producing carbonate reservoirs and deeper stacked clastic and basement formations at around 3,000 meters. Drilling and evaluation of the well are expected to conclude in October 2025. Results will guide a 12-well horizontal program, with each well forecast to produce 13–20 MMcf/d at a cost of roughly $3.3 million once the drilling learning curve is achieved.